Aliabet Proposed Infrastructure
Infrastructure |
|
Water |
- Ukai Canal network in Hansot Taluka,
- Rain water harvesting,
- Recycled water use for open spaces
|
Waste |
- Each zone would be self sustaining unit,
- Liquid non hazardous waste to be disposed using septic tanks and soak pits
|
Power & Gas |
- Tapping point for gas connectivity would be Hansot, The nearest SV (Sectionalising Valve) station is at Koliad and at Mothia in Hansot Taluka.
- Tapping line for Power connection would be from Hansot as the nearest 220 KV line is passing through Hansot (Gavasad to Kosamba line)
- Use of solar power for lighting the roads and open spaces
|
Leave a Reply